Related Posts
Time for second stage
Not so long time ago we have installed reinforcement of the starting chamber. Last week we have completed dismounting of it! Do you think dismoutnig was easier ;-)Worth to see some photos of dismounting...
Electrical cabinets prefabrication
Our Danish client ordered from us the prefabrication of electric drawers in accordence with the electric drawings provided by designer department. We prefabricated 47 drawers for it, which served as a part of large Main...
Bulb prefabrication for vessel
At the request of our client, NAVITECH prepared a technical drawing and prefabricated parts of the hull. The customer received the final product within the planned time.