One of the leading players in the Wind Farm industry has entrusted us with the task of constructing framing conteiners. The steel structure together with quality documentation was prepared according to requested standard (3834/10.90) and within the required time limit.
Related Posts
Barage reconstruction on the water
Split barge from one to two. Whole operation was on the water. The project was successful.
Construction of the ship’s middle section
Construction and lauching of the middle section of the ship.
Cooling system installation
Implementation of the cooling system for the Polish Shipwoner. The project was made in accordance with the DNV GL Rules.