One of the leading players in the Wind Farm industry has entrusted us with the task of constructing framing conteiners. The steel structure together with quality documentation was prepared according to requested standard (3834/10.90) and within the required time limit.
Related Posts
Electrical cabinets prefabrication
Our Danish client ordered from us the prefabrication of electric drawers in accordence with the electric drawings provided by designer department. We prefabricated 47 drawers for it, which served as a part of large Main...
Equipping the unit with electrical installation and devices and radar systems.
We were part of a large project in New Building vessel. As a team of NAVITECH Electricians we were responsible for the installation of radar systems and partial equipping of the ship’s machine.