One of the leading players in the Wind Farm industry has entrusted us with the task of constructing framing conteiners. The steel structure together with quality documentation was prepared according to requested standard (3834/10.90) and within the required time limit.
Related Posts
Offshore platforms
Prefabrication of offshore platform sections.
Bulb prefabrication for vessel
At the request of our client, NAVITECH prepared a technical drawing and prefabricated parts of the hull. The customer received the final product within the planned time.
Barage reconstruction on the water
Split barge from one to two. Whole operation was on the water. The project was successful.