One of the leading players in the Wind Farm industry has entrusted us with the task of constructing framing conteiners. The steel structure together with quality documentation was prepared according to requested standard (3834/10.90) and within the required time limit.
Related Posts
Electrical cabinets prefabrication
Our Danish client ordered from us the prefabrication of electric drawers in accordence with the electric drawings provided by designer department. We prefabricated 47 drawers for it, which served as a part of large Main...
Construction of the ship’s middle section
Construction and lauching of the middle section of the ship.
Anchor pocket assembly
Client - Marine Solution AB Vessel - Carrier8Location / place - Świnoujście / Euroterminal