Split barge from one to two. Whole operation was on the water. The project was successful.
Related Posts
Cooling system installation
Implementation of the cooling system for the Polish Shipwoner. The project was made in accordance with the DNV GL Rules.
Prefabrication of electrical cabinets
Switchboards prefabrication and system assembly on a new build unit.Project completed in time.
Bulb prefabrication for vessel
At the request of our client, NAVITECH prepared a technical drawing and prefabricated parts of the hull. The customer received the final product within the planned time.







