At the request of our client, NAVITECH prepared a technical drawing and prefabricated parts of the hull. The customer received the final product within the planned time.
Related Posts
Cooling system installation
Implementation of the cooling system for the Polish Shipwoner. The project was made in accordance with the DNV GL Rules.
Electrical cabinets prefabrication
Our Danish client ordered from us the prefabrication of electric drawers in accordence with the electric drawings provided by designer department. We prefabricated 47 drawers for it, which served as a part of large Main...
Auxiliary Engine replacement
Replacement two of the three power generators from 48kV to 63kV for Norwegian ship owner o/b Chemical Tankier.Our task was to find and set new aux. engines accordnig to the power balance and adapt it to work in parallel with...




