One of the leading players in the Wind Farm industry has entrusted us with the task of constructing framing conteiners. The steel structure together with quality documentation was prepared according to requested standard (3834/10.90) and within the required time limit.
Related Posts
Prefabrication of electrical cabinets
Switchboards prefabrication and system assembly on a new build unit.Project completed in time.
Anchor pocket assembly
Client - Marine Solution AB Vessel - Carrier8Location / place - Świnoujście / Euroterminal






