One of the leading players in the Wind Farm industry has entrusted us with the task of constructing framing conteiners. The steel structure together with quality documentation was prepared according to requested standard (3834/10.90) and within the required time limit.
Related Posts
Prefabrication of electrical cabinets
Switchboards prefabrication and system assembly on a new build unit.Project completed in time.
Offshore platforms
Prefabrication of offshore platform sections.
Equipping the unit with electrical installation and devices and radar systems.
We were part of a large project in New Building vessel. As a team of NAVITECH Electricians we were responsible for the installation of radar systems and partial equipping of the ship’s machine.





