Offshore containers for Wind Farm Industry
One of the leading players in the Wind Farm industry has entrusted us with the task of constructing framing conteiners. The steel structure together with quality documentation was prepared according to requested standard (3834/10.90) and within the required time limit.
Read MorePrefabrication of electrical cabinets
Switchboards prefabrication and system assembly on a new build unit.
Project completed in time.
Construction of the ship’s middle section
Construction and lauching of the middle section of the ship.
Auxiliary Engine replacement
Replacement two of the three power generators from 48kV to 63kV for Norwegian ship owner o/b Chemical Tankier.
Our task was to find and set new aux. engines accordnig to the power balance and adapt it to work in parallel with the old 48kV unit.
We installed a new PMS and modernized the Main Switchboard.
Thanks to our solutions the project was successfully.
Cooling system installation
Implementation of the cooling system for the Polish Shipwoner. The project was made in accordance with the DNV GL Rules.
Equipping the unit with electrical installation and devices and radar systems.
We were part of a large project in New Building vessel. As a team of NAVITECH Electricians we were responsible for the installation of radar systems and partial equipping of the ship’s machine.
Workshop Switchboards Prefabrications
They call us „Guys in a blue shirts”. Our NAVITECH Electricians are skilled in switchboard prefabrication for onshore, offshore, atomic and wind industry.
We cooporated with companies from Denmark, Sweden, Norway, German, Netherlands and Belgium.
Fully electrical outfiting on board new build Fishing Boat for Danish Owner.
Fully electrical outfiting accordance to DMA rules.